Job-Shop Sequencing Real Life Problem With Setup Time
Job-Shop Sequencing Real Life Problem With Setup Time

Khallel Ibrahim Mahmoud; Israr Ahmad

Volume 27, Issue 7 , May 2009, , Page 1287-1300

https://doi.org/10.30684/etj.27.7.6

Abstract
  In this paper, we analyzed the sequencing situations on two machines where the machinesetup time is not independent of processing order.A real case study of Hadhramout Industrial Company ...  Read More ...
Through manufacturing and assembly processes, materials and parts transfers inter series of workstations, where the product starts
Through manufacturing and assembly processes, materials and parts transfers inter series of workstations, where the product starts

Sawsan Sabih Al-zubedi; Zainab Alawi Ibrahim

Volume 27, Issue 1 , January 2009, , Page 1-9

https://doi.org/10.30684/etj.27.1.16

Abstract
  from raw materials and semi productspass through many tasks, these tasks differ in numbers and complexity with the productdifferece, design specifications, and also the production system ...  Read More ...