Study the Job Shop Scheduling By Using Modified Heuristic Rule
Study the Job Shop Scheduling By Using Modified Heuristic Rule

Ali F.Mwazie AL-hajamie; Sawsan S. AI-zubaidi

Volume 30, Issue 19 , November 2012, , Page 3280-3300

https://doi.org/10.30684/etj.30.19.1

Abstract
  The process of scheduling is considered as one of the more important production planning processes which faces the management of companies, because of the pressure of competition processes. ...  Read More ...
Developing Multistage Heuristic Algorithm To Minimize Idle Time And Makespan In Job Shop Scheduling
Developing Multistage Heuristic Algorithm To Minimize Idle Time And Makespan In Job Shop Scheduling

Mahmoud Abbas Mahmoud

Volume 28, Issue 14 , July 2010, , Page 4789-4805

https://doi.org/10.30684/etj.28.14.8

Abstract
  The behavior and performance of job shops have been the focus andattention in both operations research and operations management literature. Job shop scheduling has received this large ...  Read More ...