[1] R. Kangari and L. S. Riggs, “Construction risk assessment by linguistics,” IEEE Transactions on Engineering Management, vol. 36, no. 2, pp. 126-131, 1989.
[2] M. Leopardo, “Diagnosing the risks of hospital construction,” August 1, 2012 2012.
[3] J. Sollenberger, R. Copp, and R. Falsetti, “Project risk management handbook,” Office of Statewide Project Management Improvement (OSPMI), 2007.
[4] N. Square, “PA: Project Management Institute,” Dostupné z WWW:< http://www. unipi, 2008.
[5] P. Tworek, “Methodical aspects of risk assessment in investment projects in construction (survey research),” Prace Naukowe/Uniwersytet Ekonomiczny w Katowicach, pp. 102-114, 2013.
[6] N. Banaitiene and A. Banaitis, “Risk management in construction projects,” in Risk Management-Current Issues and Challenges: InTech, 2012.
[7] M. Power, The risk management of everything: rethinking the politics of uncertainty. Demos, 2004.
[8] J. Cavignac, “Managing risk in a construction company,” Construction Business Owner, pp. 29-31, 2009.
[9] PMBOK, PMBOK® Guide, Sixth Edition ed. Sixth Edition.
[10] T. Raz and E. Michael, “Use and benefits of tools for project risk management,” International journal of project management, vol. 19, no. 1, pp. 9-17, 2001.
[11] R. A. Sabah, H. Nassereddine, and A. S. Hanna, “Risk examination in the Arabian Gulf Region construction industry from international firms' insights,” Middle East Journal of Management, vol. 5, no. 1, pp. 75-88, 2018.
[12] B. Vidivelli and K. Jayasudha, “Risk Analysis for the major factors affecting the construction industry,” Int. J. Eng. Technol. Sci. Res, vol. 3, 2016.
[13] E. K. Zavadskas, Z. Turskis, and J. Tamošaitiene, “Risk assessment of construction projects,” Journal of civil engineering and management, vol. 16, no. 1, pp. 33-46, 2010.
[14] N. Ehsan, E. Mirza, M. Alam, and A. Ishaque, “Notice of retraction risk management in construction industry,” in computer science and information technology (ICCSIT), 2010 3rd IEEE International Conference on, 2010, vol. 9, pp. 16-21: IEEE.
[15] T. Petersen, “Case Study: Risk management in health care construction projects,” Jan 01, 2009 2009.
[16] A. J. Streifel and C. Hendrickson, “Assessment of health risks: related to construction,” vol. 74, no. 2, pp. 27-32, 2002.
[17] I. Mahamid, “Risk matrix for factors affecting time delay in road construction projects: owners' perspective,” Engineering, Construction and Architectural Management, vol. 18, no. 6, pp. 609-617, 2011.
[18] S. A. Assaf and S. Al-Hejji, “Causes of delay in large construction projects,” International Journal of Project Management, vol. 24, no. 4, pp. 349-357, 2006.
[19] G. Abbasi, M. Abdel-Jaber, and A. Abu-Khadejeh, “Risk analysis for the major factors affecting the construction industry in Jordan,” Emirates Journal for Engineering Research, vol. 10, no. 1, pp. 41-47, 2005.
[20] A. Akintoye and M. J MacLeod, Risk analysis and management in construction. 1997, pp. 31-38.
[21] S. Q. Wang, M. F. Dulaimi, and M. Y. Aguria, “Risk management framework for construction projects in developing countries,” Construction Management and Economics, vol. 22, no. 3, pp. 237-252, 2004.