Abstract

More attention is needed for healthcare centers projects and its development to change and improve the health situation in Iraq. The study of risk in this type of projects is essential to avoid the problems encountered during the project life cycle. This paper aimed to identify risk factors facing the construction of an advanced healthcare centers and to enhance the possible solutions based on the opinion of experts. For data collection, fifty-five risk factors were presented in a questionnaire form. The result showed that the major risk factor was government corruption, which has a direct influence on the economy and a negative impact on the infrastructure in the country and its development. The analysis showed that financial problems represent the highest risk during the years in all construction projects. Other considerable risk factors were time overrun, labor safety, as well as environmental risks, which are related to waste treatment. Other important risk factors were related to the ventilation system and air conditioning, also risk in providing continuous electrical power during the day. In term of risk groups, the five most effective ones were political, Economic, Safety, Operation & Maintenance and Construction risks.

Keywords

 
[1]   R. Kangari and L. S. Riggs, “Construction risk assessment by linguistics,” IEEE Transactions on Engineering Management, vol. 36, no. 2, pp. 126-131, 1989.
[2]   M. Leopardo, “Diagnosing the risks of hospital construction,” August 1, 2012 2012.
[3]   J. Sollenberger, R. Copp, and R. Falsetti, “Project risk management handbook,” Office of Statewide Project Management Improvement (OSPMI), 2007.
[4]   N. Square, “PA: Project Management Institute,” Dostupné z WWW:< http://www. unipi, 2008.
[5]   P. Tworek, “Methodical aspects of risk assessment in investment projects in construction (survey research),” Prace Naukowe/Uniwersytet Ekonomiczny w Katowicach, pp. 102-114, 2013.
[6]   N. Banaitiene and A. Banaitis, “Risk management in construction projects,” in Risk Management-Current Issues and Challenges: InTech, 2012.
[7]   M. Power, The risk management of everything: rethinking the politics of uncertainty. Demos, 2004.
[8]   J. Cavignac, “Managing risk in a construction company,” Construction Business Owner, pp. 29-31, 2009.
[9]   PMBOK, PMBOK® Guide, Sixth Edition ed. Sixth Edition.
[10] T. Raz and E. Michael, “Use and benefits of tools for project risk management,” International journal of project management, vol. 19, no. 1, pp. 9-17, 2001.
[11] R. A. Sabah, H. Nassereddine, and A. S. Hanna, “Risk examination in the Arabian Gulf Region construction industry from international firms' insights,” Middle East Journal of Management, vol. 5, no. 1, pp. 75-88, 2018.
[12] B. Vidivelli and K. Jayasudha, “Risk Analysis for the major factors affecting the construction industry,” Int. J. Eng. Technol. Sci. Res, vol. 3, 2016.
[13] E. K. Zavadskas, Z. Turskis, and J. Tamošaitiene, “Risk assessment of construction projects,” Journal of civil engineering and management, vol. 16, no. 1, pp. 33-46, 2010.
[14] N. Ehsan, E. Mirza, M. Alam, and A. Ishaque, “Notice of retraction risk management in construction industry,” in computer science and information technology (ICCSIT), 2010 3rd IEEE International Conference on, 2010, vol. 9, pp. 16-21: IEEE.
[15] T. Petersen, “Case Study: Risk management in health care construction projects,” Jan 01, 2009 2009.
[16] A. J. Streifel and C. Hendrickson, “Assessment of health risks: related to construction,” vol. 74, no. 2, pp. 27-32, 2002.
[17] I. Mahamid, “Risk matrix for factors affecting time delay in road construction projects: owners' perspective,” Engineering, Construction and Architectural Management, vol. 18, no. 6, pp. 609-617, 2011.
[18] S. A. Assaf and S. Al-Hejji, “Causes of delay in large construction projects,” International Journal of Project Management, vol. 24, no. 4, pp. 349-357, 2006.
[19] G. Abbasi, M. Abdel-Jaber, and A. Abu-Khadejeh, “Risk analysis for the major factors affecting the construction industry in Jordan,” Emirates Journal for Engineering Research, vol. 10, no. 1, pp. 41-47, 2005.
[20] A. Akintoye and M. J MacLeod, Risk analysis and management in construction. 1997, pp. 31-38.
[21] S. Q. Wang, M. F. Dulaimi, and M. Y. Aguria, “Risk management framework for construction projects in developing countries,” Construction Management and Economics, vol. 22, no. 3, pp. 237-252, 2004.